Opsida Ari | The Factory's Problem Solver

Opsida Ari

The factory's problem solver.

From production to shipping, it solves the factory's problems with the data you already have.

Production schedulingA machine is down, jobs are waitingThe jobs moved to the other machines

Problems

Production scheduling, cutting and other factory problems.

Each box holds a factory problem and Ari's answer.

Production scheduling

A machine is down, jobs are waitingThe jobs moved to the other machines

Inventory optimisation

Stock drops below the reorder pointThe right order at the right time

Shift planning

Staffing does not match demandAs many people as each hour needs

Sheet nesting

Parts spread over two sheetsThe same parts on one sheet

Line balancing

Stations run over the takt timeThe workload is balanced

Profile and bar cutting

Scrap across five barsThe same parts from four bars

Demand forecasting

Next month's demand is unknownA forecast with its range

Truck and container loading

Three trucks part-loadedThe same load on two trucks

Master production plan

Forecast, plan and load apartForecast, production and load in one answer

More solutions are on the way.

Try it

Send your Excel.
See the difference in cost.

Send your orders, cut list or stock movements the way you keep them today. We put Ari's answer next to your own result.

1

Send your file

Fill in the form, then reply to our email with your file attached: Excel, CSV or an ERP export, as it is.

2

Review the answer together

Your result and Ari's answer side by side, checked against your plant's rules.

3

See the difference

For cutting, the scrap difference in kg and in cost, at your own prices. For other problems, the two results side by side.

The comparison is free. Your file is used only for this comparison. We can sign a confidentiality agreement first if you wish.

Checks

Every answer is checked before it reaches you.

When Ari finds an answer, it is checked against your plant's capacity, due dates and other conditions.

  • Workload within capacity
  • Schedules that meet due dates
  • Shifts within labour rules
  • Cutting within scrap limits
An answer is foundChecked against your conditions

Connect

Starts with Excel, connects through an API.
Runs on your server or in the cloud.

Your Excel files are enough to start. For everyday use, your ERP or your own software connects to Ari through an API. The answer comes back the same way.

Data in

Excel
CSV
ERP

Ari API

Answer out

Excel, CSV
DXF

On your server

Installed on a server at your plant. Your data is processed on your own server.

In the cloud

No server to set up. You connect to Ari through the API.

Tell us about a problem at your plant.

A few short questions. We reply within two working days.

Send a problem

We reply within two working days.

Which problems do you have? (optional)

Pick as many as apply.

Where is your data today? (optional)

Pick as many as apply.

How is your data kept? (optional)
How do you do this today? (optional)
Where should Ari run? (optional)